Never built one before? That is normal. We will walk you through it.
BEFORE WE START
Who Does What
You do not need to know the vocabulary. Tell us what the building has to do and when you need to be in it. The rest is our job.
- What the building has to do
- The date you need to be open
- What you can spend
- The site, if you have one
- Due diligence and the estimate
- Drawings and city review
- Permits, subcontractors, schedule
- The build, the punch list, the warranty
- Value engineering to maximize value on your investment
Your Opening Date Runs the Job
Most owners have their date before they have drawings. A lease starts, equipment ships, or class begins, and that is fixed long before we mobilize. We build the schedule backward from it.
Some jobs are driven by the opening date and others by the budget. We help you decide which comes first, then plan the job around it. When the date comes first, we sequence the work to protect it. When the budget comes first, we look for savings in materials, systems and phasing before anything gets built.
You work with the same project manager and superintendent from preconstruction through closeout.
THE PROCESS
How a Job Runs
Four stages, in this order. You will always know which one you are in.
-
01
Preconstruction
We walk the site, run due diligence, and put together a cost estimate. Entitlements and permitting start at this stage. These are things we do every day, and we will help you through all of it.
-
02
Design
Our design partners draw the plans and renderings, then take them through city review and the architectural review board.
-
03
Construction
One superintendent runs the site from mobilization to final inspection. You get schedule updates, daily logs, photos and access to all the critical aspects of a construction project.
-
04
Closeout and Warranty
Punch list, final inspections, and turnover of the O&M manuals and warranties.
ALL THE WAY THROUGH
You Do Not Get Handed Off
The same project manager and superintendent stay on your job from the first site walk to the last warranty call.
Call either one directly and you get an answer. This is the work we do every day, and the part we are best at is making it feel ordinary for the person doing it for the first time.
COMMON QUESTIONS
Questions We Get Asked First
One project manager and one superintendent. Both stay on your job from preconstruction through the warranty period. You get their numbers at the start.
No. If you do not have an architect, we are happy to help you with that. If you already have one, we will work with them.
Site work, the building shell, interior finishes, mechanical, electrical and plumbing, and the soft costs like design, permits, and impact fees. We put together an estimate you can take to a lender.
Yes. Occupied remodels and tenant improvements are a regular part of our work. It takes phasing, temporary walls, and some after-hours scheduling, and we lay that out before we mobilize.
We run the quality check, finalize all inspections with the city, and give you everything you need to keep the building running.
Tell Us What You Are Thinking About
Tell us about your project. We will reach out and help you get the process going.
Project Inquiry
Tell us the basics and we will call you back.
Inquiry Received
A project executive will read it and call you back.