Blog Layout

ABS Kids Buildout at Pineview Plaza

Brenda Pitcher • September 26, 2023

The Newly Built ABS Kids in St. George, Utah

The buildout of the first Southern Utah location of ABS Kids has been completed. JMI Constructors is grateful to be a part of the opening of ABS Kids at Pineview Plaza, which is set to have a grand opening on September 30, 2023. This is the first of two St. George locations, and they are already open, helping new students, and taking applications for more. They specialize in helping children with autism navigate life through behavioral therapies and tailored schooling. They use ABA therapy, and their teachers have the specialized experience and credentials to best help these kids. Their ABS Kids Board-Certified Behavior Analysts can help determine what kind of therapy will work for each child.


We are grateful to be a part the beginning of such an important institution in our community. The ABS Kids space buildout includes a large and open main learning area, a front office, several classrooms, bathrooms, and a kitchen area. For more information about their services, visit ABSkids.com. Their second location is scheduled to be built inside the new building at 25 North Plaza. 

By Brenda Pitcher January 16, 2025
Total Overhaul of Alta Bank on St. George Blvd.
ABS Kids Storefront
By Brenda Pitcher December 16, 2024
Buildout for Second So. Ut. Location of ABS Kids
By Brenda Pitcher August 18, 2024
Creative Wigs in St. George Moves to Pineview Plaza after 60 Years in Business
By Brenda Pitcher July 29, 2024
JMI's Fort Pierce Construction & Management Project
More Posts
Share by: